• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
e. UH-1 Helicopter  Mooring Procedures
Figure   4-1.   Mooring   Hardware   Installation   Assembly   Details   -   Configuration   1

TM-1-1500-250-23 Aircraft Tie-down and Mooring Procedures Manual
Page Navigation
  14    15    16    17    18  19  20    21    22    23    24  
TM 1-1500-250-23 4-4 Change 2 NOTE For  local  fabrication  of  Bushing,  P/N NAS72-5E100,   see  figure   4-14.   Air- craft  with  oversize  holes  may  adjust outside diameter  to fit. NOTE Bolt,  nut  and  washer  may  be  elimi- nated  by  using  a  Quick  Release  Pin as shown in figure 4-15. (3) Connect two chain assemblies from the forward jack-points to forward mooring pad points. (4) Connect two chain assemblies from the forward mooring pad points to the rear  jack-point. (5) Connect two chain assemblies from the rear  jack-point  to the center  mooring pad points. (6) Tighten the MB-1 chain adjusters to re- move the slack for  all mooring chains.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.