• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER TURBINE INLET TEMPERATURE SYSTEM VISUAL CHECK - TM-55-1520-240-T-2_148
P O W E R   T U R B I N E   I N L E T   T E M P E R A T U R E   S Y S T EM OPERATIONAL   CHECK   AND   EMERGENCY   POWER INDICATING   SYSTEM   TEST   (Continued)

TM-55-1520-240-T-2 CH-47D Heilcopter Manual
Page Navigation
  106    107    108    109    110  111  112    113    114    115    116  
TM 55-1520-240-T 8-5.3 POWER TURBINE INLET TEMPERATURE SYSTEM OPERATIONAL CHECK AND EMERGENCY POWER INDICATING SYSTEM TEST 8-5.3 INITIAL SETUP References: Applicable Configurations: TM 55-1520-240-10 Without 74 TM 55-1520-240-23 TM 55-4920-401-13 Tools: Equipment Condition: Electrical Repairer's Tool Kit, TM 55-1520-240-23: NSN 5180-00-323-4915 Battery Connected Exhaust Gas Temperature Tester  BH112HB-53, Electrical Power On NSN 4920-00-372-4593 Hydraulic Power On T140 Test Harness No. 1 Engine Work Platform Open Materials: No. 1 Engine Lower Access Door Open None No. 2 Engine Work Platform Open No. 2 Engine Lower Access Door Open Personnel Required: Visual Check of Power Turbine Inlet Temperature Aircraft Electrician (2) and Emergency Power Indicating System Per- Rotary-Wing Aviator formed (Task 8-5.2) GO TO NEXT PAGE 8-78  Change 19







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.