Home
Download PDF
Order CD-ROM
Order in Print
CHAPTER 1 INTRODUCTION
Section II. DESCRIPTION AND APPLICATION
CHAPTER 2 HARDWARE AND AIRCRAFT REQUIREMENTS
Table 2-1. Mooring Hardware and Consumabilities
Table 2-1. Mooring Hardware and Consumabilities -cont - TM-1-1500-250-23_13
Table 2-1. Mooring Hardware and Consumabilities -cont - TM-1-1500-250-23_14
Figure 2-1. Mooring Pad Hardpoint Spacing
Figure 2-2. Mooring Pad Maximum Load Conditions
MB-1 CHAIN ADJUSTER ASSEMBLY
CHAPTER 3 TIE-DOWN PROCEDURES
Figure 3-1. OH-58D Tie-Down Configuration
Figure 3-3. AH-64 Tie-Down Configuration
Figure 3-4. UH-60 Tie-Down Configuration
Figure 3-6. UH-1 Tie-Down Configuration
Figure 3-7a. CH-47 Tie-Down Configuration (Optional)
CHAPTER 4 MOORING PROCEDURES
c. UH-60 Helicopter Morning Procedures
e. UH-1 Helicopter Mooring Procedures
For local fabrication of Bushing
Figure 4-1. Mooring Hardware Installation Assembly Details - Configuration 1
Figure 4-3. Mooring Hardware Details in Configuration 1 (Figure 4-1)
Figure 4-4. Link, Chain Detachable
Figure 4-5. Link, Chain, Detachable Installation
Figure 4-6. AH-64 Mooring Configuration
Figure 4-7. CH-47 Mooring Configuration
Figure 4-8. UH-60 Mooring Configuration
Figure 4-8a. UH-60 Mooring Configuration (When external tanks are installed).
Figure 4-8b. EH-60 Mooring Configuration.
Figure 4-8c. UH60 Mooring Configuration Alternate # 1.
Figure 4-8d. UH60 Mooring Configuration Alternate # 2.
Figure 4-9. AH-1 Mooring Configuration
Figure 4-10. UH-1 Mooring Configuration
Figure 4-12. OH-58D Mooring Configuration
Figure 4-13. Mooring Hardware For OH-58 A/C & D
FIGURE 4-14. Bushing Detail for OH-58A/C and D
4-3. Mooring on Non-paved Surfaces
e. Larger Ground Anchor for Extreme Sand Condition
Figure 4-16. Ground Anchor Assembly (For Mooring on Nonpaved Surfaces)
Figure 4-17. Ground Anchor with Wire Rope
Figure 4-21. Installation of the Ground Anchor Assembly
Figure 4-22. Polyester Rope and Webbing Binder