TM 1-1520-240-CL
N-5
* 21. Top fuselage Check.
O 22. Remove the fuel vent covers (3) (if installed)
before using ERFS.
WALK AROUND CHECK AND SECURITY BRIEF
* 1. All access doors Check.
* 2. Tiedowns, locking devices, covers, and ground
cables Removed and secured.
* 3. Cockpit, Forward Transmission, and Forward
Cabin area sound proofing Installed.
* 4. Crew/passenger briefing Complete as
required.
BEFORE STARTING ENGINES
1. Pedal adjustment Matched.
2. Shoulder harness locks Check operation and
leave unlocked.
* 3. No. 1 and No. 2 PDPs Check.
L* 4. Overhead switches and controls As required.
5. FIRE PULL handles In.
6. AGENT DISCH switch Check.
* 7. XMSN OIL PRESS switch SCAN.
* 8. XMSN OIL TEMP switch SCAN.
* 9. VGI switches NORM.
10. CYCLIC TRIM switch AUTO.
* 11. AFCS SYSTEM SEL switch OFF.
* 12. M-130 or AN/ALE-47 SAFE or OFF.
13. Avionics equipment OFF; set as required.
O 14. HUD OFF.
15. 712 EMERG ENG TRIM switches AUTO.
16. SWIVEL switch LOCK.