TM 1-1500-250-23
(4) Connect two crossing chain assemblies diago-
nally from the aft aircraft landing gear mooring rings to the
rear mooring pad points.
(5) Connect two side chain assemblies from the aft
aircraft landing gear mooring rings to the rear mooring pad
points.
(6) Tighten the MB-1 adjusters to remove the slack
from all mooring chains. Not ools are required.
c.
UH-60 Helicopter Morning Procedures.
(1) Position the aircraft on the mooring pad with the
longitudinal centerline of the aircraft directly above and
parallel to the longitudinal axis of the pad as shown in fig-
ures 4-8, 4-8a, 4-8b, 4-8c and 4-8d. Figures 4-8, 4-8c and
4-8d are to be used for aircraft that do not have external
tanks installed Figure 4-8a is to be used when aircraft have
external tanks installed. Figure 4-8b is to be used for the
EH-60 aircraft.
(2) For mooring of the UH-60 per figure 4-8:
(a) Position the aircraft front rooming rings di-
rectly in-line with the front mooring pad points.
(b) Connect two chain assemblies from the for-
ward aircraft mooring rings at F.S. 308 to the front rooming
pad points.
(c) Connect two chain assemblies from the front
mooring pad points to the aft aircraft mooring rings at F.S.
485.
(d) Connect two chain assemblies from the aft air-
craft mooring rings to the center rooming pad points.
(e) Tighten the MB-1 chain adjusters to remove
the slack from all mooring chains. No tools are required.
(3) For mooring the UH-60 per figure 4-8a:
(a) Position the aircraft cargo hook directly in-
line with the center mooring pad points.
(b) Connect two lateral chain assemblies from the
aircraft cargo hook to the center mooring pad ponts (Ref.
figure 4-8, view A-A).
(c) Connect two chain assemblies from the center
mooring pad points to the aft aircraft mooring rings at F.S.
485.
(d) Connect two chain assemblies from the aft air-
craft mooring rings to the rear mooring pad points.
(e) Tighten the MB-1 chain adjusters to remove
the slack from all mooring chains. No tools are required.
(4) For mooring the EH-60 per figure 4-8b:
(a) Position the aircraft front rooming rings di-
rectly in-line with the front mooring pad points.
(b) Connect two chain assemblies from the for-
ward aircraft mooring rings at F.S. 308 to the front mooring
pad points.
(c) Connect two chain assemblies from the center
mooring pad points to the forward aircraft rooming rings at
F.S. 308.
(d) Connect two chain assemblies from the aft air-
craft mooring rings at F.S. 485 to the center mooring pad
points.
(e) Tighten the MB-1 chain adjusters to remove
the slack from all mooring chains. No tools are required.
(5) For alternate rooming of UH-60 per figure 4-8c:
(a) Position the aircraft front mooring rings di-
rectly in-line with the center mooting pad points as shown
in figure 4-8C.
(b) Connect two chain assemblies from the for-
ward aircraft mooriing rings at F.S. 308 to center mooring
pad points as shown in figure 4-8c.
(C) Connect two chain assemblies from the center
mooring pad points to the aft aircraft mooring rings at F.S.
485 as shown in figure 4-8c.
(d) Connect two chain assemblies from the aft air-
craft rooming rings at F.S. 485 to the rear mooring pad
points as shown in figure 4-8C.
(e) Tighten the MB-l chain adjusters to remove
the slack from all mooring chains. No tools are requiredl.
(6) For alternate rooming UH-60 per figure 4-8d.
(a) Position the aircraft on the mooring pad with
longitudinal centerline of the aircraft directly above and
parallel to the longitudinal axis of the pad as shown in figure
4-8d. Position the aircraft front mooring rings, at F.S. 308.
10 feet aft of the forward mooring pad points as shown in
figure 4-8d.
(b) Connect two chain assemblies from the front
mooring rings at F.S. 308 to the forward mooring pad points
as shown in figure 4-8d.
(c) Connect two chain assemblies from the front
mooring rings at F.S. 308 to the center mooring pad points
as shown in figure 4-8d.
(d) Connect two chain assemblies from the aft air-
craft mooring rings at F.S. 308 to the center mooring pad
points as shown in figure 4-8d.
(e) Connect two chain assemblies from the air-
craft mooring rings at F.S. 485 to the rear rooming pad
points.
(f) Tighten the MB-1 chain adjusters to remove
the slack from all mooring chains. No tools arm required.
d. AH-1 Helicopter Mooring Procedures.
(1) Position aircraft on mooring pad with longitudi-
nal centerline of aircraft directly above and parallel to the
longitudinal axis of pad, shown in figure 4-9. The aft moor-
ing ring is to be located 2 feet forward of the center mooring
pad points.
4-2 Change 3