TM 1-1500-250-23(4) Connect two crossing chain assemblies diago-nally from the aft aircraft landing gear mooring rings to therear mooring pad points.(5) Connect two side chain assemblies from the aftaircraft landing gear mooring rings to the rear mooring padpoints.(6) Tighten the MB-1 adjusters to remove the slackfrom all mooring chains. Not ools are required.c.UH-60 Helicopter Morning Procedures.(1) Position the aircraft on the mooring pad with thelongitudinal centerline of the aircraft directly above andparallel to the longitudinal axis of the pad as shown in fig-ures 4-8, 4-8a, 4-8b, 4-8c and 4-8d. Figures 4-8, 4-8c and4-8d are to be used for aircraft that do not have externaltanks installed Figure 4-8a is to be used when aircraft haveexternal tanks installed. Figure 4-8b is to be used for theEH-60 aircraft.(2) For mooring of the UH-60 per figure 4-8:(a) Position the aircraft front rooming rings di-rectly in-line with the front mooring pad points.(b) Connect two chain assemblies from the for-ward aircraft mooring rings at F.S. 308 to the front roomingpad points.(c) Connect two chain assemblies from the frontmooring pad points to the aft aircraft mooring rings at F.S.485.(d) Connect two chain assemblies from the aft air-craft mooring rings to the center rooming pad points.(e) Tighten the MB-1 chain adjusters to removethe slack from all mooring chains. No tools are required.(3) For mooring the UH-60 per figure 4-8a:(a) Position the aircraft cargo hook directly in-line with the center mooring pad points.(b) Connect two lateral chain assemblies from theaircraft cargo hook to the center mooring pad ponts (Ref.figure 4-8, view A-A).(c) Connect two chain assemblies from the centermooring pad points to the aft aircraft mooring rings at F.S.485.(d) Connect two chain assemblies from the aft air-craft mooring rings to the rear mooring pad points.(e) Tighten the MB-1 chain adjusters to removethe slack from all mooring chains. No tools are required.(4) For mooring the EH-60 per figure 4-8b:(a) Position the aircraft front rooming rings di-rectly in-line with the front mooring pad points.(b) Connect two chain assemblies from the for-ward aircraft mooring rings at F.S. 308 to the front mooringpad points.(c) Connect two chain assemblies from the centermooring pad points to the forward aircraft rooming rings atF.S. 308.(d) Connect two chain assemblies from the aft air-craft mooring rings at F.S. 485 to the center mooring padpoints.(e) Tighten the MB-1 chain adjusters to removethe slack from all mooring chains. No tools are required.(5) For alternate rooming of UH-60 per figure 4-8c:(a) Position the aircraft front mooring rings di-rectly in-line with the center mooting pad points as shownin figure 4-8C.(b) Connect two chain assemblies from the for-ward aircraft mooriing rings at F.S. 308 to center mooringpad points as shown in figure 4-8c.(C) Connect two chain assemblies from the centermooring pad points to the aft aircraft mooring rings at F.S.485 as shown in figure 4-8c.(d) Connect two chain assemblies from the aft air-craft rooming rings at F.S. 485 to the rear mooring padpoints as shown in figure 4-8C.(e) Tighten the MB-l chain adjusters to removethe slack from all mooring chains. No tools are requiredl.(6) For alternate rooming UH-60 per figure 4-8d.(a) Position the aircraft on the mooring pad withlongitudinal centerline of the aircraft directly above andparallel to the longitudinal axis of the pad as shown in figure4-8d. Position the aircraft front mooring rings, at F.S. 308.10 feet aft of the forward mooring pad points as shown infigure 4-8d.(b) Connect two chain assemblies from the frontmooring rings at F.S. 308 to the forward mooring pad pointsas shown in figure 4-8d.(c) Connect two chain assemblies from the frontmooring rings at F.S. 308 to the center mooring pad pointsas shown in figure 4-8d.(d) Connect two chain assemblies from the aft air-craft mooring rings at F.S. 308 to the center mooring padpoints as shown in figure 4-8d.(e) Connect two chain assemblies from the air-craft mooring rings at F.S. 485 to the rear rooming padpoints.(f) Tighten the MB-1 chain adjusters to removethe slack from all mooring chains. No tools arm required.d. AH-1 Helicopter Mooring Procedures.(1) Position aircraft on mooring pad with longitudi-nal centerline of aircraft directly above and parallel to thelongitudinal axis of pad, shown in figure 4-9. The aft moor-ing ring is to be located 2 feet forward of the center mooringpad points.4-2 Change 3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business