TM 55-1520-240-PM
PHASE NO. _____
Area Name and No.
Aircraft Serial No.
Date
LEFT FUSELAGE, AREA #2
Inspect
Phase
Nos
Inspection Requirements
Status
Faults and/or Remarks
Action Taken
Initial
ALL
2.14 Antennas and supports for
damage and security. Doppler antenna
for cleanliness.
ALL
2.15 Hydraulic ground power service
panel connections for leakage, dust
caps secure.
ALL
2.16 Fuel pods for dents, skin cracks or
holes, bond voids, delaminations, and
evidence of trapped fluids under skin.
ALL
2.17 Inspect fuel pods for corrosion and
electrical bonding.
ALL/C
2.18 Main and auxiliary fuel tanks
for evidence of leaks. Filler caps for
security. Visible portions of tank vents
for damage and obstruction. Vent
fairings for security. Sump drains for
leaks.
ALL
2.19 APU fuel pump electrical
connector, mounting bracket, and
attaching hardware for security.
Access 63
"FOD REMINDER"
Check work area for tools and parts after completion of maintenance and inspection.
2-8