TM 55-1520-240-PMPHASE NO. _____Area Name and No.Aircraft Serial No.DateRIGHT FUSELAGE AREA #3InspectPhaseNo’sInspection RequirementsStatusFaults and/or RemarksAction TakenInitialALL/C3.8 Remove, clean, inspect, and repackaft landing gear wheel bearings.ALL3.9 Aft landing gear wheel for cracksand corrosion. Paint for chipping orpeeling. Bolts for torque and sealant.ALL3.10 Axle housing retaining bolts (2) forsecurity and corrosion. Interior areaof spindle for corrosion and for paintchipping and peeling.ALL3.11 Aft landing gear strut for leaks,cleanliness of exposed piston, normalextension (visual).ALL3.12 Aft landing gear support structurefor buckling, cracks, corrosion, loose ormissing fasteners.ALL/C3.13 Aft landing gear drag links forsecurity, corrosion, cracks, nicks,dents, twisting, and displacementof bearings from bores. All surfacesof lower drag link for cracks, withparticular attention to area aroundforward trunnion anti-rotation bolt hole.Access 17"FOD REMINDER"Check work area for tools and parts after completion of maintenance and inspection.2-13
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business