Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
4-6.1.1 POWER TURBINE CONTROL SYSTEM (N2) SCHEMATIC DIAGRAM
POWER TURBINE (N2) CONTROL SYSTEM VISUAL CHECK 4-6.2 (Continued)
TM-55-1520-240-T-1 CH-47D Heilcopter Manual
Page Navigation
289
290
291
292
293
294
295
296
297
298
299
TM 55-1520-240-T
4-6.2
POWER TURBINE (N2)
CONTROL SYSTEM
VISUAL CHECK
4-6.2
FAULT ISOLATION
PROCEDURE
Equipment Condition:
INITIAL SETUP
TM 55-1520-240-23:
Battery Disconnected
Applicable Configurations:
Electrical Power Off
Without
74
Hydraulic Power Off
Tools:
Controls Closet
Acoustic
Blanket Removed
Aircraft Mechanic's
Tool Kit,
Controls Closet Panel Open
NSN 5180-00-323
-4692
Left and Right Electrical Compartment Access
Materials:
Doors Open
None
N2 Control Box Access Cover Removed
Personnel Required:
Engine Work Platforms Open
Medium Helicopter
Repairer
Engine Access Covers Open
References:
TM 55-1520-240-23
GO TO NEXT PAGE
Change 17 4-118.1/(4-118.2 blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business