TM 55-1520-240-T
4-10.11 NO. 2 ENGINE DOES NOT MOTOR OR N1 GAUGE DOES NOT REACH 10%
4-10.11
FAULT ISOLATION PROCEDURE
INITIAL SETUP
Personnel Required:
Applicable Configurations:
Aircraft Electrician (2)
With 74
Medium Helicopter Repairer
Tools:
Aircraft Powerplant Repairer
Aircraft Mechanic's Tool Kit,
References:
NSN 5180-00-323-4692
TM 1-2840-265-23
Electrical Repairer's Tool Kit,
TM 55-1520-240-23
NSN 5180-00-323-4915
Equipment Condition:
Powerplant Repairer's Tool Kit;
TM 55-1520-240-23:
NSN 5180-00-323-4944
Battery Connected
Multimeter
Electrical Power On
Materials:
Hydraulic Power On
None
GO TO NEXT PAGE
4-240 Change 17