TM 1-1520-240-BDDAMAGE ASSESSMENT MARKINGSREPRESENTS DAMAGEMARKINGSMEANINGSTO INDICATE DAMAGE HAS BEEN ASSESSED AND EVALUATED:DRAW A CIRCLE AROUND THE DAMAGE.TO INDICATE STRUCTURAL REPAIRS ARE REQUIRED:DRAW A SECOND LINE ABOUT 1/4 TO 1/2 WAY AROUND THEINITIAL CIRCLE THEN DRAW SLASHES OR CROSSHATCHBETWEEN THE TWO CIRCULAR LINES.TO INDICATE DAMAGE TO SYSTEMS REQUIRING REPAIRS:DRAW A SERIES OF "CURLEY CUE" LINES ABOUT 1/4 TO 1/2 WAYAROUND THE INITIAL CIRCLE.A LARGE CROSS DRAWN THROUGH THE INSTRUCTION MARK-INGS INDICATES REPAIRS HAVE BEEN MADE.TO INDICATE REPAIR INSTRUCTIONS APPLY TO INTERNAL DAM-AGE:DRAW A DASHED CIRCLE AROUND THE REPAIR INSTRUCTIONS.NOTEWRITTEN INSTRUCTIONS WITH NO CIRCLESAPPLY TO EXTERNAL DAMAGE.TAGFigure 1-9. Damage Assessment Markings (Sheet 1 of 3)1-14
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business