TM 1-1520-240-MTF2-65B HOVER (CONT.) F7. Perform PAT/HIT if previously deferred asrequired.8. Power — Check. Note torque, EOP, and N1.NOTEAfter work has been done on the flight controlsystem, the dash actuators should be set to 36.0inches and electrically disconnected. Amechanical rig check is not required if noadjustment have been made to the flight controlsor the pitch links.9. Mechanical Rig Check. (If no adjustments havebeen made to the flight controls or pitch changelinks, proceed to step 10).NOTEEven though the AFCS selector switch is in theBOTH ON position during check, the AFCS OFFcaution lights may stay on.a. Perform crosswind hover — Check cyclicposition of 3/4 inch aft $ 1/4 inch.b. Land helicopter.c. AFCS selector switch — OFF. Electricallyreconnect DASH actuator.d. AFCS Selector switch — ON.10. Controls positions. (Refer to Section V).a. Longitudinal.(1) Perform crosswind hover.(2) Stick position indicator — Check N $1/4 inch.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business