TM 1-1520-240-MTF
2-63
B BEFORE HOVER (CONT.)
NOTE
HIT/PAT check may be deferred to hover check.
HIT/PAT is not required for the engine(s) that
required a TEAC/PAC.
B 4. 712 Health Indicator Test (HIT) check
Perform as required.
B 5. 714A Power Assurance Test (PAT) Perform
as required. May be deferred and completed in
conjunction with torque differential check if
required.
B* 6. RRPM Set as required.
CAUTION
Monitor all fuel tanks for overpressurization.
NOTE
During the fuel system check, observe the
following:
No fuel will be pumped into any AUX tank.
At 1650 $50 pounds, the main tank (with its
pumps on) will start receiving fuel from its
respective AUX tanks and stop when tank
capacity reaches 1800 $50 pounds, maximum
2000"50.
7. RH Fuel system Check Start, note fuel
quantity in all tanks.
a. CROSSFEED FUEL VALVE(S) OPEN.
b. LH FUEL PUMPS OFF.
c. Fuel selector Monitor RH tank fuel level.