TM 55-1520-240-PM
PHASE NO. _____
Area Name and No.
Aircraft Serial No.
Date
FORWARD ROTOR, CROWN, AND
TUNNEL, AREA #7
Inspect
Phase
Nos
Inspection Requirements
Status
Faults and/or Remarks
Action Taken
Initial
ALL
7.9 Flight control hydraulic reservoir,
cooler, and mount structure for cracks,
buckling, and corrosion. Cooler duct for
security, cracks, and dents. Access 30,
31, 32, 72
ALL
7.10 Cruise guide indicator signal
conditioner for condition and security.
ALL/C
7.11 Second stage mixing bellcranks,
links, and support fittings for damage,
corrosion, security, and evidence of
interference. Control stops for security
and damage. Access 72
ALL
7.12 Electrical wiring and connectors
in hydraulic compartment for security.
Wiring for chafing and proper support.
Insulation for cuts, cracks, and fraying.
Access 30, 72
ALL
7.13 Flight boost cooling fan for security,
corrosion, and damage. Paint for
chipping or peeling. Safety screen for
dents, breaks, and security. Adjacent
structure for damage, cracks, and
corrosion. Access 30, 72
"FOD REMINDER"
Check work area for tools and parts after completion of maintenance and inspection.
2-46