TM 55-1520-240-PMPHASE NO. _____Area Name and No.Aircraft Serial No.DateFORWARD ROTOR, CROWN, ANDTUNNEL, AREA #7InspectPhaseNo’sInspection RequirementsStatusFaults and/or RemarksAction TakenInitialALL/C7.32 Forward rotary-wing head forcorrosion, damage, and cracks inpitch-varying housing, pitch shaft, andweb areas of hub. Head retaining nutfor security and installation of washerand retaining ring. Access 30, 722, 4, C7.33 Drain and service all rotary-winghead reservoirs.ALL/C7.34 Check forward rotary-wing headretaining nut for specified torque. Referto TM 55-1520-240-23.ALL/C7.35 Inspect the installed horizontalhinge pins and bearings perTM 55-1520-240-23.ALL/C7.36 Forward rotary-wing head droopstops (blades raised) for damage, wear,and security. Retorque fixed droop stopretaining bolts. Access 30, 72"FOD REMINDER"Check work area for tools and parts after completion of maintenance and inspection.2-51
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business