TM 55-1680-358-12&P
Table 1-1. Leading Particulars (Continued)
System Installation Data:
Time to Install System (Including Tiedown Rings) ................ ........................................... 8 man/hours
Time to Install System (Excluding Tiedown Rings) ............... ........................................... 4 man/hours
System Removal Data:
Time to Remove System (Excluding Tiedown Rings) ...................................................... 4 man/hours
* Quantity dependent on size and helicopter capacity.
** System does not provide for personnel transport but it is compatible with personnel.
*** Quantity dependent on weight of pallets.
NOTE
A suitable mix of the above cargo can be handled as required.
1-6