TM 55-1520-240-T6-2.3TRANSMISSION CHIP DETECTORS AND DEBRIS SCREENS OPERATIONAL CHECK (Continued)6-2.3TASKRESULTCHECK AFT SHAFT CHIP DETECTOR INSTALLATION55.Remove aft shaft chip detector plug (36)and inspectit. (Refer to TM 55-1520-240-23.)56.Connect connector to aft shaft chip detector plug(36).57.Place a jumper wire between tip of plug (37) and edgeXMSN CHIP DET (Without 74 ) XMSN CHIP DETR (Withof plug (36).74) capsule (9) shall come on. AFT SHAFT TRANSMIS-SION CHIP DETECTOR indicator (38) shall change toblack-and-white fan. If capsule (9) does not come on orindicator (38) is still black, go to Task 6-2.22.58.Remove jumper wire. Install aft shaft chip detectorXMSN CHIP DET (Without 74 ) XMSN CHIP DETR (Withplug (36).74) capsule (9) shall go out.59. Set GND switch (6) to RESET, then to GND.Indicator (38) shall change to all-black.FOLLOW-ON MAINTENANCE:TM 55-1520-240-23:Battery disconnected.Electrical power off.Forward drip pan installed.Aft transmission baffles closed.Pylon lower fairing closed.Pylon hinged fairing closed.Pylon right work platform closed.Engine transmission fairings installed.Engine air inlet screens installed.END OF TASK6-40 Change 17 Page 6-41 is a blank page.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business