TM 55-1520-240-PM
PHASE NO. _____
Area Name and No.
Aircraft Serial No.
Date
RAMP AREA #8
Inspect
Phase
Nos
Inspection Requirements
Status
Faults and/or Remarks
Action Taken
Initial
ALL/C
8.34 Power steering and swivel lock
module for leaks and security of
components and connectors. Mount
structure for cracks and buckling.
ALL
8.35 Ramp control valve, sequence
valve, pressure actuated valve, and
ramp actuators for security, leaks, and
damage.
ALL
8.36 Hydraulic fill module for leaks
and security. Pump and linkage for
condition. Filler filter for cleanliness
and condition. Filler cap for positive
closure.
ALL
8.37 Utility hydraulic hand pump
for leaks, cracks, and security of
mountings. Mount hardware and
structure for cracks, buckling, and
security. Pump handle and linkage for
security and excessive wear.
"FOD REMINDER"
Check work area for tools and parts after completion of maintenance and inspection.
2-62