TM 55-1520-240-PMPHASE NO. _____Area Name and No.Aircraft Serial No.DateRAMP AREA #8InspectPhaseNo’sInspection RequirementsStatusFaults and/or RemarksAction TakenInitialALL8.6 Ramp and cargo door for twisting,damage, security of fittings, sealdeterioration, cracks, and corrosion.Cargo door for proper manualoperation.1, 38.7 Jettisonable cargo door for easeof release. Mechanism for cracks,wear, twisting, and security. Atreinstallation, locking mechanismsfor secure engagement, handle forclosed and latched position and propersafety. Refer to TM 55-1520-240-T.ALL8.8 Ramp and cargo door coaming fordamage, cracks, delamination, andsecurity.ALL8.9 Cargo loading ramp extensions fortwist, cracks, and security. Attachinghardware for security.ALL8.10 APU start module for leaks,security of mounting, components, andelectrical connector. Mount structurefor buckling and cracks.ALL/C8.11 Aft transmission oil cooler housingand mounts for cracks and security."FOD REMINDER"Check work area for tools and parts after completion of maintenance and inspection.2-57
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business